Concrete Surface Fillers

Fill in and shape horizontal, vertical, and overhead concrete surfaces, such as steps and columns.
Mix cement surface fillers with water. They can be used to fill holes up to 7" deep. These quick-setting fillers are ready for foot traffic in just 30 minutes. Application time, after mixing, is 7 minutes.
Container | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Net Weight | Type | Begins to Harden, min. | Reaches Full Strength, hrs. | Formulation | Consistency | Mix Ratio | Approximate Coverage @ Thick. | Max. Thick. | For Use Outdoors | Application Temp. Range, °F | Color | Finishing Method | For Use On | Each | |
Cement | |||||||||||||||
3 lbs. | Bag | 7 | 24 | Cement | Putty | 4:1 | 1 1/2 sq. ft. @ 1/4" | 7" | Yes | 50° to 100° | Gray | Drill, Sand | Concrete, Masonry, Stone | 000000 | 000000 |
Concrete Patching Compounds


Patch concrete floors and stairs with these compounds.
Mix gypsum compounds with water. They can also be used to anchor bolts, railings, and posts. When used outdoors, apply a sealer (not included) for best results.
Container | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Net Weight, lbs. | Type | Begins to Harden, min. | Reaches Full Strength | Consistency | Mix Ratio | Approximate Coverage @ Thick. | Max. Thick. | Application Temp. Range, °F | For Use On | Color | Each | |
Gypsum | ||||||||||||
5 | Box | 15 | 60 min. | Powder | 3.5:1 | 2 1/2 sq. ft. @ 1/4" | Not Rated | 25° to 100° | Concrete | Gray | 0000000 | 000000 |
10 | Pail | 15 | 60 min. | Powder | 3.5:1 | 5 sq. ft. @ 1/4" | Not Rated | 25° to 100° | Concrete | Gray | 0000000 | 00000 |
25 | Box | 15 | 60 min. | Powder | 3.5:1 | 13 sq. ft. @ 1/4" | Not Rated | 25° to 100° | Concrete | Gray | 0000000 | 00000 |
50 | Pail | 15 | 60 min. | Powder | 3.5:1 | 26 sq. ft. @ 1/4" | Not Rated | 25° to 100° | Concrete | Gray | 0000000 | 00000 |
Leak-Stopping Concrete Crack Fillers
Stop slow-flowing and weeping leaks in concrete. These crack fillers begin to harden in three to five minutes to create a permanent fix that won't shrink.
To use cement fillers, mix with water.

Container | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Net Weight, lbs. | Type | Begins to Harden, min. | Reaches Full Strength | Consistency | Mix Ratio | For Max. Crack Wd. | Approx. Coverage @ Thick. | Max. Thick. | Application Temp. Range, °F | Color | For Use On | Each | |
Cement | |||||||||||||
10 | Pail | 5 | 28 days | Powder | 3:1 | 1" | 6 1/2 ft. @ 1/2" | 1" | 40° to 95° | Gray | Concrete, Masonry, Stone | 0000000 | 000000 |
50 | Pail | 5 | 28 days | Powder | 3:1 | 1" | 33 ft. @ 1/2" | 1" | 40° to 95° | Gray | Concrete, Masonry, Stone | 00000000 | 000000 |
Concrete Leveling Compounds

Give new life to damaged and worn concrete floors. These leveling compounds also fill minor depressions and cracks. Apply with a trowel.
Cement compounds are ready for foot traffic in 3 to 4 hours. Add water and mix before applying.
Container | Application | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Net Weight, lbs. | Type | Begins to Harden | Reaches Full Strength | Consistency | Mix Ratio | Approximate Coverage @ Thick. | Max. Thick. | For Use Outdoors | Temp. Range, °F | Time After Mixing, min. | Finishing Method | For Use On | Color | Each | |
Cement | |||||||||||||||
20 | Pail | 3 hrs. | 24 hrs. | Putty | 5:1 | 20 sq. ft. @ 1/8" | 1 1/2" | Yes | 40° to 90° | 20-45 | Drill, Sand, Saw, Tap | Concrete | Gray | 00000000 | 000000 |
50 | Pail | 20 min. | 28 days | Putty | 5:1 | 50 sq. ft. @ 1/8" | 1 1/2" | Yes | 40° to 90° | 0-10 | Drill, Sand, Saw, Tap | Concrete | Gray | 000000 | 00000 |